DisCos Blame Technical Glitches For Inability To Maintain 20-Hour Power Supply

April 9, 2024
Nigerian Govt Spends ₦380bn On Electricity Subsidy In Q2 2024 — NERC

Several electricity distribution companies, commonly known as DisCos, are facing challenges in providing the mandated 20-hour power supply to customers on Band A feeders.

This failure has led to apologies and explanations from DisCos across various regions of Nigeria.

Join our WhatsApp Channel

The Benin Electricity Distribution Company (BEDC) and Kano Electricity Distribution Company (KEDCO) were among those issuing apologies.

BEDC cited technical faults and load shedding by the Transmission Company of Nigeria (TCN) as reasons for power disruptions. KEDCO specifically mentioned a circuit breaker issue affecting the 33KV Gaskiya feeder.

Similarly, the Ibadan Electricity Distribution Company (IBEDC) expressed regret for not meeting the expected supply hours due to TCN system outages and tripping on IBEDC feeders.

Meanwhile, the Abuja Electricity Distribution Company (AEDC) attributed prolonged outages in parts of the Federal Capital Territory to technical faults at the Gwagwalada Transmission Station.

READ ALSO: REVEALED: The Untold Story Of WPG, Eko DisCo Board, Management Tussle

DisCos’ struggles come amidst new directives from the Nigerian Electricity Regulatory Commission (NERC), requiring Band A customers to receive a minimum of 20 hours of electricity daily. Failure to meet this standard could result in downgrading to other bands based on supply hours.

Despite these directives, some customers claim they have not been receiving the stipulated supply hours since April 3 when the new tariff was announced. Additionally, complaints have arisen from customers in Bands B to E regarding overbilling by their service providers.

The Minister of Power, Adebayo Adelabu, has issued warnings of sanctions against erring DisCos, while NERC urges customers to report non-compliance.

In response to the situation, a representative from KEDCO stated, “We understand the inconvenience that comes with unstable power, and we deeply regret any inconvenience it has caused. The reason behind the inconsistency in supply on the 33KV Gaskiya feeder was due to a circuit breaker issue.”

Similarly, IBEDC stated, “We sincerely apologise for our inability to deliver the estimated hours of supply on your feeder. This was due to TCN system outages and tripping on IBEDC feeders.”

While DisCos continue to grapple with technical challenges, customers remain hopeful for improved service delivery and adherence to regulatory standards.

emmmmmm
+ posts

Emmanuel Ochayi is a journalist. He is a graduate of the University of Lagos, School of first choice and the nations pride. Emmanuel is keen on exploring writing angles in different areas, including Business, climate change, politics, Education, and others.

Emmanuel Ochayi

Emmanuel Ochayi is a journalist. He is a graduate of the University of Lagos, School of first choice and the nations pride. Emmanuel is keen on exploring writing angles in different areas, including Business, climate change, politics, Education, and others.

Zimbabwe currency
Previous Story

Zimbabwe’s ZiG Currency To Go Into Circulation April 30

Nigeria To Receive $1bn Afreximbank Loan In May For Bolstering Economy 
Next Story

Nigeria To Receive $1bn Afreximbank Loan In May For Bolstering Economy 

Featured Stories

Latest from Business

Bulls Charge Ahead As NGX Shatters Records As Market Cap Surpasses N50trn

NGX Gains Over N178.91bn As Ikeja Hotel Lead Gainers

The Nigerian Exchange (NGX) Limited, also known as the stock market, closed with an equity capitalisation of N91.28 trillion on Friday, November 28. According to data from the bourse, the market capitalisation increased by N178.91 billion from the N91.10 trillion reported on
Zimbabwe currency
Previous Story

Zimbabwe’s ZiG Currency To Go Into Circulation April 30

Nigeria To Receive $1bn Afreximbank Loan In May For Bolstering Economy 
Next Story

Nigeria To Receive $1bn Afreximbank Loan In May For Bolstering Economy 

Don't Miss

Fuel Scarcity: Marketers Urge Sustained Emergency Supply As Stock Drops

NNPC Attributes Fuel Scarcity To Logistics Issues

The Nigerian National Petroleum Company Limited (NNPC), claiming that its

EFCC Arrests 24 Suspects Over Oil Bunkering In Rivers

Operatives of the Economic and Financial Crimes Commission (EFCC) have